Refrigerants, pressure, leak tightness: provably under control.
Refrigeration and air conditioning systems, heat pumps, compressed air and pressure vessels carry double obligations: the F-gas Regulation for refrigerants and the BetrSichV (German Ordinance on Industrial Safety and Health) for pressure. Add logbooks, inspection reports and maintenance contracts. vi does the calculating, planning and checking alongside you.
- Commercial and industrial refrigeration
- Air conditioning and chilled water systems
- Heat pumps
- Compressed air systems
- Pressure vessels and steam boilers
- Piping
- Systems with natural refrigerants
On the right is an example from this industry: documents arrive in the chat, vi reads them, assigns them and suggests what to do. Assets, companies and amounts are made up.
| Interval | |
|---|---|
| Without leak detection | every 6 months |
| With leak detection | every 12 months |
| Last check | 3 Jun 2026 |
What lands on your desk.
Equipment logbooks and records
Refrigerant, charge, top-ups, recovery and leak checks, as the F-gas Regulation requires.
Leak check records
The interval depends on the charge in CO₂ equivalent and on whether a leak detection system is installed.
Inspection reports for pressure systems
External and internal inspection plus strength test. For pressure vessels, the BetrSichV specifies maximum intervals of 2, 5 and 10 years.
Maintenance contracts
Scope of services, refrigerant billed by actual usage or at a flat rate, emergency service and response times.
Quotes for retrofit and replacement
When refrigerants become scarce and expensive, quotes arrive for retrofits or new systems.
Where things usually go wrong.
Wrong inspection interval
The leak check interval depends on CO₂ equivalent, not on kilograms. After a retrofit it changes, but the calendar often does not.
Topping up instead of repairing
Refrigerant is topped up at every service, and the leak stays. The quantities are in the equipment logbook, but nobody adds them up.
Refrigerants with no future
For refrigerants with a high global warming potential, top-up and use bans apply, taking effect in stages. Anyone who does not plan the changeover has a problem at the next leak.
Two inspection worlds, no coordination
A refrigeration system is often a pressure system too. The leak check and the BetrSichV inspection are handled by different bodies, and the dates are rarely coordinated.
Read, check, plan.
Calculate CO₂ equivalent
vi reads refrigerant and charge from the equipment logbook and derives the inspection interval from them.
Evaluate top-up quantities
vi totals top-ups over time and flags systems where they point to a leak.
Bundle inspections
Leak checks, maintenance and pressure inspections are planned so that as few appointments as possible are needed.
Make retrofits comparable
Quotes for retrofit and replacement are put side by side by performance, refrigerant and cost.
Cold store with two refrigeration systems
A food warehouse operates two refrigeration systems with R404A and a compressed air station. A refrigeration company handles maintenance and leak checks, and an inspection body inspects the pressure vessels.
This workflow is an example. Figures and findings are chosen for illustration.
- 1
Upload
Equipment logbooks, inspection records and the maintenance contract go to vi.
- 2
Calculate
32 kg of R404A is about 125 t of CO₂ equivalent, so a leak check every six months. In twelve months, 6 kg were topped up.
- 3
Flag
The top-up quantities point to a leak. vi creates a ticket and flags the system for changeover planning.
- 4
Plan
The leak check and the pressure vessel inspection fall in the same week. The quotes for the retrofit are prepared for comparison.
What applies to this industry.
A selection of the rules that govern maintenance, inspection and service in this industry. Each with key dates and sources.
F-gas Regulation (EU) 2024/573
German Ordinance on Industrial Safety and Health (Betriebssicherheitsverordnung)
Pressure Equipment Directive 2014/68/EU
Machinery Regulation (EU) 2023/1230
Product Liability Directive (EU) 2024/2853
NIS2 Directive (EU) 2022/2555
Short answers.
Questions in detail.
Expand a question for the answer, the original wording of the rules and links to the official text.
How do I determine the interval for the leak check?
The interval depends on the charge in tonnes of CO2 equivalent. The regulation defines it as the product of the weight of the gas in tonnes and its global warming potential. Ten kilograms of a refrigerant with a global warming potential of 2,000 is therefore 20 tonnes of CO2 equivalent. You find the global warming potential of the gases and mixtures in the annexes of the regulation.
Leak checks are required for equipment from 5 tonnes of CO2 equivalent. Hermetically sealed, correspondingly labeled equipment below 10 tonnes is excluded. For the intervals: below 50 tonnes at least every twelve months, or every 24 months with a leakage detection system. From 50 to under 500 tonnes every six months, or twelve with a system. From 500 tonnes every three months, or six with a system. Certified personnel carry out the check.
The typical trap is in the calendar. If the system is converted or the charge changes, the interval shifts, but the service company's schedule often stays at the old rhythm. Recalculate the CO2 equivalent after every conversion and record the calculation in the equipment log. vi calculates it from the refrigerant and charge in the equipment log and shows the calculation so you can check it.
“‘tonne of CO2 equivalent’ means a quantity of greenhouse gases expressed as the product of the weight of the greenhouse gases in metric tonnes and of their global warming potential;”
“for equipment that contains 50 tonnes of CO2 equivalent or more, but less than 500 tonnes of CO2 equivalent of fluorinated greenhouse gases listed in Annex I or 10 kilograms or more, but less than 100 kilograms of fluorinated greenhouse gases listed in Section 1 of Annex II: at least every 6 months or, where a leakage detection system is installed in such equipment, at least every 12 months;”
What belongs in the equipment log, and how long must I keep the records?
For every system that has to be checked for leaks, you keep separate records. They contain the quantity and type of gases in the system, quantities added during maintenance or because of a leak, with the date, quantities recovered, for additions the information on whether the gas was recycled or reclaimed, the details of the company and the person who did the work including the certificate number, the dates and results of leak checks and repairs, and, at decommissioning, the measures for recovery and disposal.
You must keep the records for at least five years unless they are stored in an authority's database. The service company that does the work for you also keeps copies for five years. On request, you present the records to the authority.
In practice, the equipment log is what decides things at the first question about a leak. If a top-up is missing, the basis for spotting anomalies is missing too. So ask the service technician for an entry or a copy after every visit. If a few kilos are topped up at every service, that is a leak and not consumption. You only see it if the quantities are added up over the years. vi adds up top-ups over time and flags systems where they point to a leak.
“Operators of equipment which is required to be checked for leaks pursuant to Article 5(1) shall establish and keep records for each piece of such equipment, specifying the following information: […] (b) the quantities of gases added during maintenance or servicing or due to leakage, including the date of such addition; (c) the quantity of gases recovered; […]”
“Unless the records referred to in paragraph 1 are stored in a database set up by the competent authorities of the Member States, the following rules apply: (a) the operators referred to in paragraph 1 shall keep the records referred to in that paragraph for at least 5 years; […]”
Do I have to repair a leak right away, or may I just top up?
If a leak is detected, operators must ensure that the equipment is repaired without undue delay. Topping up alone is not enough. The regulation also asks generally that all technically and economically feasible measures be taken to keep leakage to a minimum.
After a leak in equipment subject to leak checks has been repaired, another duty follows. A certified person must check the equipment to verify that the repair was effective. That happens at the earliest after 24 hours of operation and no later than one month after the repair. This follow-up check goes into the records with date and result.
In practice: order the leak location and the repair in writing for every leak found, agree the follow-up check at the same time and file all reports together. On every maintenance invoice where refrigerant was topped up, ask where the leak was. A top-up without a documented repair is a warning sign. The refrigerant keeps escaping, and for certain gases topping up is prohibited anyway. vi flags top-ups in service reports and equipment logs for which no repair is documented.
“Where a leakage of fluorinated greenhouse gases is detected, the operators and manufacturers of equipment and the operators of facilities where fluorinated greenhouse gases are used, and the undertakings in possession of such equipment during its transport or storage, shall ensure that the equipment or facility where fluorinated greenhouse gases are used is repaired without undue delay.”
“Where the equipment is subject to leak checks under Article 5(1) and a leak in the equipment has been repaired, the operators of the equipment shall ensure that the equipment is checked by a natural person who is certified in accordance with Article 10 at the earliest after an operating time of 24 hours has elapsed but not later than 1 month after the repair to verify that the repair has been effective.”
Which refrigerants may I no longer top up, and how do I plan the changeover?
Since January 1, 2025, using fluorinated greenhouse gases with a global warming potential of 2,500 or more for the maintenance or servicing of refrigeration equipment of any kind has been prohibited. For systems with a charge of 40 tonnes of CO2 equivalent or more, that already applied earlier. For existing systems there is a transition rule: reclaimed and recycled gases may, under conditions, still be used for servicing until January 1, 2030. Recycled gases may only be used by the company that recovered them during servicing, or by the company for which that recovery was done. For air-conditioning equipment and heat pumps the prohibition has applied since January 1, 2026, with a corresponding transition rule until 2032. From January 1, 2032, a prohibition follows for stationary refrigeration equipment, except chillers, for gases with a global warming potential of 750 or more.
So plan the changeover before the next leak. Record the refrigerant, global warming potential, charge and leak history for each system. Systems with repeated top-ups come first. Compare quotes for conversion and replacement by the same criteria: refrigerant and its global warming potential, capacity, energy use, safety requirements of the new refrigerant and cost over the term. vi puts the quotes side by side.
“The use of fluorinated greenhouse gases, with a global warming potential of 2 500 or more, for the maintenance or servicing of refrigeration equipment with a charge size of 40 tonnes of CO2 equivalent or more, shall be prohibited. From 1 January 2025, the use of fluorinated greenhouse gases, with a global warming potential of 2 500 or more, for the maintenance or servicing of any refrigeration equipment shall be prohibited.”
“From 1 January 2032, the use of fluorinated greenhouse gases listed in Annex I, with a global warming potential of 750 or more, for the maintenance or servicing of stationary refrigeration equipment, with the exclusion of chillers, shall be prohibited.”
Who inspects compressed air receivers and pressure systems, at what intervals, and is my refrigeration system covered?
Pressure vessels, piping and steam boilers are components of pressure systems under Annex 2 Section 4 of the Industrial Safety Ordinance. Whether an approved inspection body or a person qualified to inspect does the work depends on pressure, volume and fluid group. Tables 2 to 11 of the Section settle that. Vessels and piping of a refrigeration system or heat pump can also form a pressure system if they reach the thresholds. Whether that applies to you, you clarify from the manufacturer's documents and your risk assessment.
You set the inspection interval for the pressure system as a whole in the risk assessment. It must not exceed ten years and must be determined at the latest six months after commissioning. For components that an inspection body tests, maximum intervals apply: steam boilers 1, 3 and 9 years for external, internal and strength inspection, pressure vessels 2, 5 and 10 years, piping 5 years for the external and strength inspection. For some vessels the external inspection is not required. An inspection is also carried out before first commissioning and after changes that require inspection.
You keep records and inspection certificates at the place of operation for the entire period of use. The leak check under the F-gas Regulation and the inspection under the Industrial Safety Ordinance often run through different bodies. Coordinate the dates so the system is down only once.
“The inspection interval for the pressure system under number 2.1, to be set by the employer within the risk assessment, must not exceed ten years.”
Unofficial translation
“The inspection interval to be set under § 3 paragraph 6 within the risk assessment must be determined for pressure systems under this Section at the latest within six months of commissioning the pressure system.”
Unofficial translation
“The inspections under numbers 4 and 5 are to be carried out by an approved inspection body. By way of derogation from sentence 1, the inspections can be carried out by persons qualified to inspect if this is provided for in Tables 2 to 11 or in number 7 Table 12.”
Unofficial translation
Who may work on refrigeration systems and heat pumps that contain F-gases?
Natural persons who carry out installation, maintenance, repair, leak checks or recovery on refrigeration systems, air-conditioning systems, heat pumps and other covered equipment must be certified under Article 10 of the F-gas Regulation. The service company as a legal person must also be certified for this work. A check by uncertified personnel does not fulfill your duty as an operator.
For you that means: before ordering, ask to see the certificate number of the company and of the technician, and put copies in the asset file. The regulation requires in any case that the equipment log names the company that did the work, for legal persons also the natural person who acted, and, where applicable, the certificate number. If that entry is missing, part of the proof is missing.
Keep two things apart. The F-gas certificate authorizes work on the refrigerant circuit. It does not replace the qualification to inspect pressure systems under the Industrial Safety Ordinance. If someone is to do both in one visit, they must prove both. At decommissioning, the duty applies again that certified personnel recover the gas. vi reads company data and certificate numbers from service reports and assigns them to the equipment log.
“As regards the equipment referred to in paragraph 2, points (a) to (e), and points (a) and (b) of this paragraph, the checks shall be carried out by natural persons certified in accordance with Article 10.”
“Legal persons carrying out the installation, maintenance or servicing, repair or decommissioning of the equipment listed in Article 5(2), points (a) to (e), and Article 5(3), points (a) and (b), shall be certified in accordance with Article 10 and shall take precautionary measures to prevent leakage of fluorinated greenhouse gases listed in Annex I and Section 1 of Annex II.”
When do I need a leakage detection system, and what do I have to do with it?
Operators of stationary refrigeration systems, air-conditioning systems, heat pumps and fire protection equipment with fluorinated greenhouse gases of 500 tonnes of CO2 equivalent or more must ensure that the equipment has a leakage detection system. The same applies from 100 kilograms for the gases in Annex II Section 1. The system must alert the operator or a service company to any leakage. The system itself must be checked at least once every twelve months to ensure that it works properly.
Below this threshold a system is voluntary, but not without benefit. With a built-in leakage detection system, the interval of the leak check doubles: from twelve to 24 months, from six to twelve and from three to six. For systems with short check intervals, that can pay off. Compare the cost of the system and the annual function check with the cost of the checks that no longer apply.
A system whose alerts nobody reads does not help. Set out in the maintenance contract who receives the alert, the operator or the service company, within what time someone responds and how events are logged. Record every alert with date and action in the equipment log. Then you have documented answers when someone asks about a leak.
“Operators of stationary equipment listed in Article 5(2), points (a) to (d), that contains fluorinated greenhouse gases listed in Annex I in quantities of 500 tonnes of CO2 equivalent or more or 100 kilograms or more of gases listed in Section 1 of Annex II, shall ensure that the equipment has a leakage detection system which alerts the operator or a service company of any leakage.”
“Operators of stationary equipment listed in Article 5(2), points (a) to (e), that is subject to paragraphs 1 or 2 of this Article shall ensure that leakage detection systems are checked at least once every 12 months to ensure their proper functioning.”
Related articles.
On 1 January 2027, the EU halves the quantity of HFC refrigerants that may be placed on the market. In March, leak checks follow for air conditioning in trucks, construction machinery and trains. If you operate or service refrigeration, air conditioning or heat pump systems, review your logbook, certificates and top-up strategy now.
Read article →Since 11 September, manufacturers of gateways, routers and service tools must report actively exploited vulnerabilities to ENISA within 24 hours. Operators covered by the new German BSI Act report significant incidents with the same deadline to the BSI, Germany's Federal Office for Information Security. The service provider in between is not automatically obligated, so the reporting route belongs in the service contract.
Read article →Maintenance that thinks ahead.
Show us a service contract or inspection report. We'll show you what vi makes of it.